
Bluewater Uranium Mill
First Title II Uranium Facility Accepted by US DOE for Long-term Operation and Maintenance. The Bluewater Uranium Mill was the second-largest Title II uranium processing
First Title II Uranium Facility Accepted by US DOE for Long-term Operation and Maintenance. The Bluewater Uranium Mill was the second-largest Title II uranium processing
In the early 1990’s, the Copperton Tailings Impoundment, which collected water from the Bingham Canyon Mills, became part of the South OU of the Bingham
Built before the railroad, made safe for earthquakes The Tabernacle built before the coming of the railroad (1869), was constructed primarily of items and materials
Relief Well Design and Construction In 2015 a debris plug, consisting of collapsed soil and mine timbers ar the entrance to the Gold King Mine
Centralized heating for lower operating cost and environmental impact As part of the newly built Conference Center, the Church of Jesus Christ of Latter-day Saints
After the EPA declared the Tintic Mining District to be on the NPL list, Atlantic Richfield retained Anderson Engineering. Our Senior Construction Team prepared surveys
The engineering company that’s been shown to save clients on average 20% versus legacy providers.
Anderson Engineering Company. Inc.
Licensed in UT, CO, ID, MT, WY, AZ, NM, CA, TX, LA